ensures the steadiness and consistency of the essential operate of factors. We have exported our goods to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the Usa, Canada, and so on. Obtaining amassed treasured experience in cooperating with foreign consumers, With 30-yr abundant business knowledge and information comma we have earned EPTTization in manufacturing and providing exceptional good quality big EPTs
These are fabricated in conformity with defined business stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds comma the offered assortment is widely acknowledged by the clients for functions like ideal efficiency and EPTTer life
These precision engineered EPTs are broadly demanded throughout varied EPTT
The high good quality ring EPT with module 45 we made signifies our strong fabrication ability
Rewards colon
EPT with buyer designs
EPT machining and warmth treatment method abilities
Rigorous good quality management
Prompt shipping
Expertise in cooperation with EPTT five hundred businesses
Method colon
EPT solcasting
Normalizing and tempering
Tough machining
Quenching and tempering
End machining
Enamel grinding
EPTQ quenching solcarburization
We can supply you in various method circumstances
Solutions for several conclude markets and applications
EPT
EPTlurgy
EPTT technology
SuXiHu (West EPT) Dis.Hu (West EPT) Dis.
Cement EPTT
Port EPTTry
Oil and normal
Paper generating
OEM EPT scenario
EPTT EPTT
Testing method colon
QA documents colon chemical composition report comma mechanical houses report comma UT report comma warmth treatment report comma dimension examine report
The information on chemical composition report and mechanical homes report are accredited by 3rd social gathering comma HangEPT Ship EPT EPT Institute comma CSIC
UT examination colon a hundred percnt ultrasonic take a look at
Heat remedy report colon provide original duplicate of warmth therapy curve soltime table period
Technical specs of EPT colon
No period | Merchandise | Description |
one | Diameter | le15m |
two | Module | le45 |
3 | EPT | Cast Alloy Metal comma Solid EPTT Metal comma Cast Alloy Metal comma Solid EPTT Steel |
four | Framework From | Built-in comma Fifty percent to 50 % comma 4 Pieces and A lot more Pieces |
5 | Heat Treatment method | Quenching amp Tempering comma Normalizing amp Tempering comma Carburizing amp Quenching amp Tempering |
6 | Tooth Form | Annular EPT comma Outer EPT Ring |
7 | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | ISO comma EN comma DIN comma AISI comma ASTM comma JIS comma IS comma GB |
Inspection and Test Outline of Girth EPT colon
No period | Merchandise | Inspection Spot | Acceptance Standards | Inspection Phase | Certificates |
1 | EPTT Composition | Sample | EPT Need | When Smelting After Warmth Treatment |
EPTT Composition Report |
2 | EPT Houses | Sample lparTest Bar on the EPT Human body rpar | EPTnical Prerequisite | After Heat Treatment method | EPT Qualities Report |
3 | Heat Therapy | EPTT Human body | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | In the course of Warmth Treatment method | Heat Treatment method Report Curves of Heat Treatment method |
four | Hardness Examination | Tooth Surface area comma 3 Factors For each 90 deg | EPTnical Prerequisite | After Warmth Therapy | Hardness Teat Report |
Following Semi Finish Machining | |||||
five | Dimension Inspection | EPTT Human body | Drawing | Following Semi Finish Machining | Dimension Inspection Report |
Complete Machining | |||||
6 | EPTic EPTT Check lparMT rpar | Tooth Floor | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | After Finish EPT Hobbing | MT Report |
7 | UT | Spokes Components | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Soon after Rough Machining | UT Report |
Following Welded | |||||
After Semi Complete Machining | |||||
eight | PT | Defect Area | No Defect Indicated | After Digging Soon after Welded |
PT EPTrd |
9 | Mark Inspection | EPTT Physique | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Final Inspection | Images |
ten | Visual appeal Inspection | EPTT Human body | CIC aposs Prerequisite | Ahead of EPTT lparFinal Inspection rpar |
|
11 | Anti-rust Inspection | EPTT Entire body | Agreed Anti-rust Agent | Before EPTT | Photographs |
12 | EPTT Inspection | EPTT Physique | Agreed EPTT Sort | Throughout EPTT | Images |
FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ties For EPT EPT ring colon
No time period | Merchandise | Description |
1 | Smelting amp EPTT Functionality | 40t comma50t comma 80t Sequence AC Electric powered Arc Furnace 2 times150t comma 60t EPTT Ladle Refining Furnace 150t comma 60t Series VD solVOD Furnace twenty times18m Massive Pouring FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ty We can pour 900t refining liquid steel a single time comma and achieve EPT poured 600t metal ingots time period We can create the substantial top quality metal of far more than 260 metal grades as carbon steel commastructural alloy steel and the structural steel comma refractory steel and stainless metal of EPTT need period of time The maXiHu (West EPT) Dis.mum fat of casting steel comma gray casting comma graphite cast iron and non-ferrous casting is 600t comma 200t comma 150t and 20t individually interval |
two | EPT Capacity | The only one particular in the term comma the most technologically EPTd and the biggest specification18500t Oil Push comma equipped with 750t periodm forging procedure EPTT 8400t H2o Press 3150t Water Push 600t H2o Push Phi5m EPT EPT Ring Mill lpar WAGNER commaGermany rpar Phi12m EPT EPT Ring Mill We can roll rings of different EPTs of carbon metal comma alloy metal comma higher temperature alloy metal and non-ferrous alloys this kind of as copper alloy comma EPT alloy and EPTTium alloy time period Max interval Diameter of rolled ring will be 12m interval |
three | Warmth Remedy Ability | 9 times9 times15m comma8 times8 times12m comma6 times6 times15m comma15 times16 times6 period5m comma16 times20 times6m comma7 times7 times17m Sequence Warmth Furnace and Warmth Treatment Furnaces phi2 period0 times30m comma phi3 period0 times5 period0m Series Warmth Remedy Furnaces phi5 period0 times2 period5m comma phi3 period2 times1 period5m comma phi3 period0 times5 period0m comma phi2 period0 times5m Sequence Carburizing Furnaces amp Nitriding Furnaces amp Quenching Bathes phi2 period0 times30m Effectively Kind CNC EPT Furnaces Phi3 period0 times5 period0M Horizontal Fuel Temperature-differential Furnace EPTT-frequency and EPTT-position Quenching Lathe of Pinion Shaft |
4 | Machining Ability | one period geq5m CNC EPT Responsibility Vertical Lathes 12m CNC EPTT-column Vertical Lathe 10m CNC EPTT-column Vertical Lathe 10m CNC One-column Vertical Lathe 6 period3m EPT Duty Vertical Lathe 5m CNC EPT Obligation Vertical Lathe |
two period of time geq5m Vertical EPT Hobbing EPTTs 15m CNC Vertical EPT Hobbing EPTT 10m EPT Hobbing EPTT 8m EPT Hobbing EPTT 5m EPT Hobbing EPTT 3m EPT Hobbing Machining |
||
3 interval EPTTorted EPT-precision EPT EPT EPTTs period8m~3 period5m CNC Molding EPT EPT EPTTs |
||
four period of time Massive Uninteresting amp Milling EPTTs 220 CNC EPTr-mounted Boring amp Milling EPTT two hundred CNC EPTr-mounted Uninteresting amp Milling EPTT 160 CNC EPTr-mounted Dull amp Milling EPTT |
Screening Process colon
middot QA DOC colon EPTT Composition Report comma EPT Homes Report comma UT Report comma Heat Treatment Report comma Dimensions Check Report
middot The knowledge on chemical composition report and mechanical qualities report are authorized by third party comma HangEPT Ship EPT EPT Institute comma CSIC interval
middot UT examination colon a hundred percnt ultrasonic check according to EN15718-3 comma SA388 comma Sep 1921 C solc etc period
middot Heat Treatment method Report colon give first copy of warmth therapy curve soltime table interval